Rail Drainage Design
The Brief
Riddwood Consulting Engineers were engaged by UKDN Waterflow (LG Group) to provide a design for the renewal of an existing drainage design near Minster Station, Kent
The Solution
Riddwood Consulting Engineers designed a drainage renewal scheme for the defective system which was in existence. For the initial survey we were able to produce a scheme design for the location of catch-pits (man-holes) and the exact depth of drainage pipes. Using this information, the Riddwood designer was able to prescribe gradients for the drainage system to ensure the hydraulic compliance of the systems, which includes the drainage using completely self-cleansing.
We utilised the virtual data in existence on the Virtual Site Visit (ViSiVi) interface along with the GNSS survey and the CCTV survey.
The Project was developed using Tekla TEDDS, Microsoft Excel and AutoCAD 2017.
If you would like to find out more about our service and how we can help your business, please call us on 0118 978 7930 or email info@riddwood.co.uk